H3c-technologies H3C SecPath F100-C-EI Manual de usuario Pagina 26

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 79
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 25
Installation Manual
H3C SecPath F100-C-EI Firewall
Chapter 2 Preparing for Installation
2-6
2.1.5 Lightning Protection Requirements
Although the F100-C-EI is designed to be lightning resistant, your
device can get damaged when excessive lightning is present. To
protect your device against lightning,
z Ensure the chassis is connected to earth ground.
z Ensure the ground point of the power socket is well
connected to earth ground.
z Add a lightning arrester to the front end of the power input to
better protect the power supply against lightning strikes.
2.1.6 Checking the Workbench
When installing the device on a workbench, make sure that:
z The workbench is firm enough to support the weight of the
device and its installation accessories.
z The workbench is well grounded.
2.1.7 Rack-Mounting Requirements
When installing the device in a rack, make sure that:
z The firewall is installed in an open rack. However, if you
want to mount it in a closed rack, make sure that the rack
has a good ventilation system.
z The rack is stable enough and can support the weight of the
firewall and the installation accessories;
z The rack dimensions meet the requirements for installing the
firewall. Adequate clearance is provided at the left and right
sides of the rack for good ventilation.
Vista de pagina 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 ... 78 79

Comentarios a estos manuales

Sin comentarios