H3c-technologies H3C SecPath F100-C-EI Manual de usuario Pagina 39

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 79
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 38
Installation Manual
H3C SecPath F100-C-EI Firewall
Chapter 3 Installing the Firewall
3-10
3.6 Verifying Installation
Each time before you power on the firewall during installation,
verify that:
z Enough room has been left around the firewall chassis for
adequate heat dissipation and the workbench is stable.
z The power source fits the firewall.
z The PGND wire of the firewall is correctly connected.
z The firewall has been correctly connected to other devices,
such as a console terminal.
Caution:
Installation verification is extremely important, because the normal
functioning of the firewall relies on its firm installation, proper
grounding, and correct power feed.
Vista de pagina 38
1 2 ... 34 35 36 37 38 39 40 41 42 43 44 ... 78 79

Comentarios a estos manuales

Sin comentarios