H3c-technologies H3C SecPath L1000-A Load Balancer Manual de usuario Pagina 17

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 84
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 16
9
Installing the L1000-A
IMPORTANT:
Keep the packages of the L1000-A and the components for future use.
Figure 3 L1000-A installation flow
Confirming installation preparations
Before you install the L1000-A, verify that:
You have read "Preparing for installation" car
efully and the installation site meets all the
requirements.
A 19-inch rack is ready for use.
The rack is sturdy and securely grounded.
There is sufficient clearance around the rack for heat dissipation and installation.
No debris exists inside or around the rack.
Choose a correct rack mounting position for the L1000-A. Make sure the heaviest device is placed
at the bottom of the rack.
Vista de pagina 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 83 84

Comentarios a estos manuales

Sin comentarios